Home
Back

Paide cogeneration of heat and power plant

Client: AS Filter / Completed: 2013

11.2 MW main steam piping was built for the Paide cogeneration plant, and 200 m of other technological pipes were installed, DN500, maximum hydrostatic test pressure: 78 bar

Paide_1

Paide_3

Paide_2


Warning: Invalid argument supplied for foreach() in /data01/virt97773/domeenid/www.keinfra.ee/htdocs/test.keinfra.ee/content/themes/keinfra/views/reference.php on line 52